top of page
blue bg_HD.png

Renovation & Reconstruction

Complete delivery from concept and permits
to construction and final handover

Complete delivery from concept to final handover

Get a Site Assessment

Rebuild with clarity.

Renew with control.

Renovation demands more than construction skills — it requires technical assessment, adaptive planning, and disciplined risk management. We approach every renovation with the structure and foresight of new construction, while addressing the realities of existing conditions.

Renovation by Level of Complexity

Clear distinction between cosmetic upgrades, partial renovation, and full structural reconstruction.

Risk-Aware Planning

Early technical assessment to identify hidden issues and reduce surprises during construction.

Work in Occupied Properties

Phased execution and protection measures to minimize disruption when homes remain in use.

One Team from Strip-Out to Finish

Structural works, systems, finishes, and coordination handled under one responsible contractor.

Renovation by Level of Complexity

Clear distinction between cosmetic upgrades, partial renovation, and full structural reconstruction.

Risk-Aware Planning

Early technical assessment to identify hidden issues and reduce surprises during construction.

Work in Occupied Properties

Phased execution and protection measures to minimize disruption when homes remain in use.

One Team from Strip-Out to Finish

Structural works, systems, finishes, and coordination handled under one responsible contractor.

Key Benefits

levels of service

level I

Cosmetic Renovation

Targeted improvements focused on finishes and visible upgrades, without altering structure or core systems.

Wallpaper Removal Process

1

Typical scope includes:

Interior painting & surface renewal

Flooring replacement

Bathroom & kitchen updates

Lighting fixture upgrades

Minor carpentry & detailing

_DSC1474.jpg

When it's appropriate:

For properties in sound structural condition that require aesthetic refresh or modernization.

Typical duration:

2-6 weeks

* depending on size and material availability

Book a Consultation

Typical duration:

2-6 weeks

* depending on size and material availability

Book a Consultation
_DSC1474.jpg

Typical scope includes:

Interior painting & surface renewal

Flooring replacement

Bathroom & kitchen updates

Lighting fixture upgrades

Minor carpentry & detailing

When it's appropriate:

For properties in sound structural condition that require aesthetic refresh or modernization.

Wallpaper Removal Process

level I

Cosmetic Renovation

Targeted improvements focused on finishes and visible upgrades, without altering structure or core systems.

level II

Partial
Renovation

Moderate intervention involving layout adjustments and system upgrades, while preserving primary structural elements.

untitled-10557-Pano-Edit.jpg

2

Typical scope includes:

Reconfiguration of selected rooms

Wall removals

(non-load-bearing where possible)

Electrical and plumbing upgrades

HVAC improvements

Kitchen and bathroom replacement

Calle Rosa-24.jpg

When it's appropriate:

For properties needing functional improvement, upgraded systems, or partial redesign without full structural rebuilding.

Typical duration:

1-4 months

* depending on complexity and engineering coordination

Book a Consultation

Typical duration:

1-4 months

* depending on complexity and engineering coordination

Book a Consultation
Calle Rosa-24.jpg

Typical scope includes:

Reconfiguration of selected rooms

Wall removals
(non-load-bearing where possible)

Electrical and plumbing upgrades

HVAC improvements

Kitchen and bathroom replacement

When it's appropriate:

For properties needing functional improvement, upgraded systems, or partial redesign without full structural rebuilding.

untitled-10557-Pano-Edit.jpg

level II

Partial
Renovation

Moderate intervention involving layout adjustments and system upgrades, while preserving primary structural elements.

Typical duration:

3-8 months

* depending on approvals, scope, and technical requirements

Book a Consultation
_DSC1334-Улучшено-NR.jpg

Typical scope includes:

Structural alterations and reinforcement

Complete replacement of electrical, plumbing, and HVAC systems

Full interior rebuild

Façade, roofing, and building envelope works where required

Exterior upgrades and landscaping integration

When it's appropriate:

For aging properties, investment upgrades, or complete repositioning of the asset.

e_villa_before.jpg

level III

Full Reconstruction

Comprehensive transformation involving structural modification and complete renewal of systems and finishes.

level III

Full Reconstruction

Comprehensive transformation involving structural modification and complete renewal of systems and finishes.

e_villa_before.jpg

3

Typical scope includes:

Structural alterations and reinforcement

Complete replacement of electrical, plumbing, and HVAC systems

Full interior rebuild

Façade, roofing, and building envelope works where required

Exterior upgrades and landscaping integration

_DSC1334-Улучшено-NR.jpg

When it's appropriate:

For aging properties, investment upgrades, or complete repositioning of the asset.

Typical duration:

3-8 months

* depending on approvals, scope, and technical requirements

Book a Consultation

our work

what is included

One contract. one team.

full scope.

​From design, documentation, permits, structural works, systems upgrades, envelope improvements to interior fit-out, and hands-on project management from day one to handover.

Firefly_in the same style, same background color, create a sketch in a technical drawing s
Review & Design Development

Evaluation of existing conditions, spatial planning, and design development aligned with renovation scope.

Firefly_in the same style, same background color, create a sketch in a technical drawing s
Technical Documentation

Renovation-specific structural, MEP, and construction drawings adapted to existing conditions.

Firefly_in the same style, same background color, create a sketch in a technical drawing s
Permits & Approvals

Permit management and authority coordination where required for renovation works.

Firefly_in the same style, same background color, create a sketch in a technical drawing s
Structural Modifications

Selective demolition, structural reinforcement, layout changes, and reconstruction works.

Firefly_in the same style, same background color, create a sketch in a technical drawing s
Engineering Systems Upgrades

Replacement or upgrading of electrical, plumbing, HVAC, and ventilation systems.

Firefly_in the same style, same background color, create a sketch in a technical drawing s
Building Envelope Improvements

Façade upgrades, insulation, waterproofing, roofing works, and external improvements where applicable.

Firefly_in the same style, same background color, create a sketch in a technical drawing s
Interior Finishes & Fit-Out

New finishes, kitchens, bathrooms, joinery, and final detailing.

Firefly_in the same style, same background color, create a sketch in a technical drawing s
Project Management

Planning, coordination, on-site supervision, and quality control throughout the renovation.

Villa refurbishments, apartment renovations, structural reconstructions, layout reconfigurations, commercial fit-outs, and investment property upgrades.

types of projects

Project Scale

size:

80 - 800+ m²*

(project-dependent)

duration:

1 - 8 months*

(depending on scope and structural involvement)

budget:

varies significantly**

(based on existing condition, system upgrades, and finish level)

* Each project is defined individually following technical review, design development, and scope confirmation.

** Renovation projects may vary in cost due to hidden structural or technical conditions.

Project-Specific Considerations

Apartment
vs. Villa Renovations

apartment

Apartment renovations involve structural limitations within shared buildings, requiring coordination with building management and stricter constraints on envelope or façade works.

 villa

Villa projects offer greater structural freedom - enabling extensions, exterior improvements, and more comprehensive system redesign. Each project is evaluated within its regulatory and structural context.

Working in
Occupied Homes

Renovation does not always require vacating the property.

We regularly execute phased renovation projects in occupied homes, implementing:

Clearly defined
work zones
Dust & noise
control measures
Scheduled system
shutdowns

FAQ

What types of renovation do you offer?

We handle cosmetic renovations, partial renovations, and full structural reconstruction, depending on the condition and goals of the property.

Is renovation more expensive than new construction?

Renovation often costs more per square meter than new construction because we're working with what exists - uncovering hidden issues, respecting original structure, and carefully integrating new with old.

But the outcome is incomparable: a building with history, solidity, and character that no new construction can replicate.

Early technical assessment ensures we navigate these complexities with clarity and without surprises.

Can you renovate an occupied property?

Yes. We regularly work in occupied homes using phased planning and protection measures to minimize disruption.

How do you handle hidden issues discovered during renovation?

We conduct early technical assessments and communicate clearly if unforeseen issues arise, including cost and timeline implications before proceeding.

Do you upgrade engineering systems during renovation?

Yes. Electrical, plumbing, HVAC, and ventilation systems are often upgraded or replaced as part of renovation projects.

Will I have one point of contact throughout the project?

Yes. A dedicated project manager coordinates all works and communication from start to completion.

Do I need an architect, or do you provide design services?

We provide architectural and interior design as part of our renovation service - there's no need to hire separate designers unless you prefer to work with your own.

How are payments structured?

Payment is structured in phases tied to measurable project milestones. A typical structure includes:

+Initial deposit upon contract signing (covers design, permits, and planning)
+Progressive payments during construction tied to completion stages (structure, systems, finishes)
+Final payment upon handover and project completion

Exact terms are defined in contract based on project scope and timeline. All payment schedules are agreed upfront, and any variations are documented formally before work proceeds.

What are the typical challenges in renovation projects?

Renovation projects often reveal issues that aren't visible until work begins. We commonly encounter hidden structural deficiencies, outdated electrical and plumbing infrastructure, non-compliant previous modifications, moisture and insulation problems, and the challenge of integrating new systems within existing structures. Our approach starts with an early technical assessment specifically to identify these risks upfront — reducing uncertainty, preventing mid-project surprises, and supporting a realistic budget from the start.

Renovation demands structure, foresight, and disciplined execution.

We apply the planning rigor of full construction

to every level of intervention.

Renovation demands structure, foresight, and disciplined execution.

we deliver full-build rigor

at every level

Considering a renovation?

Let’s define the right level

Request assessment
bottom of page